We have inspection plans and specifications on the revisioin method for some operations.
We can stop using it on a few, so I removed the inspection plan and specification from the revision method, I approved it and checked the revision back in. The plan and specification are not longer on the method.
When we get details for a job, the inspection plan and operation are populating and requiring us to process them.
What step am I misssing?