We have a customer that wants us to produce Product A. During the manufacturing process Product A needs to go through heat treat operation. Product A is serial tracked and the raw material used is lot tracked from receipt from supplier. The customer is requiring that a Tensile Bar (Product B) which must be from the same original raw material lot as Product A and is on another job, must go through the same heat treat operation (the 2 jobs must be combined in the same furnace load). Both of these jobs would be in WIP at the same time. Product B would not be in stock.We do not do Make to Order/Make Direct but Make to Stock. We could do a Make Direct for this, but it still will not solve our same furnace load issue to bring the two WIP jobs together for the heat treat operation and be scheduled to run together.In trying to test Batch job to see if this would solve our issue, the Batch checkbox was not enabled, so assuming that because our finished good part is serialized, that is causing f
Already have an account? Login
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.