We would like to see a full and complete Project costing for all parts from a Sales Order that are linked to a project. Sales Order lines for manufactured parts are linked to a Project and WBS Phase and have an associated job. This works fine. However Purchased part costing is never reflected on Project Costing, even if linked to a Project (and additionally a phase if needed).
Is there some way of doing this in Epicor ERP (E10) ?