We have a few parts that we need to set up with Bill of Materials. We have a fixed cost associated with the part that needs to be added to the BoM to make sure it is calculated with the overall cost.
This isn’t a part or an operation. It is basically a fee that we need to tack onto the overall cost. Think of it as a sort of setup fee for each part that is created.
What is the best way to put this into the BoM?
Best answer by pjackson
View original