If I look at the WIP balance on part tracker, should it match a calculated balance on a job? I have parts where the calculated difference between the first and second operation postings do not match the balance on part tracker for that job.
For example: Operation Completed Quantity is 186480 and Operation 20 is 124320. Balance should be 62160. WIP quantity on the job and part tracker shows 26640.
I am trying to create a schedule for the second operation that shows balance available.
Thank you.
Best answer by mhuffar