I had a user move something from inspection to a customer instead of to stock. Anybody have a procedure for fixing this? Do I need to issue a new RMA for the parts. Thank you,
Hello Group, I have put together an agenda for next week’s meeting. Tentative Agenda8:30 AM - 9:00 AM - Arrival and light breakfast9:00 AM - 9:30 AM - Group business9:30 AM - 10:00 AM - Power BI Example - Bridget Casey - Bracalente10:00 AM - 10:15 AM - Break and networking10:15 AM - 11:00 AM - Mobile Warehouse - Bridget Casey and Phil Leaman11:00 AM - 12:00 Noon - National Accounts / Alternate Bill-Tos - Tamara - EpiCenter12:00 Noon - 1:00 PM - Lunch and networking1:00 PM - 2:00 PM - ECM Automation in Sales - Joe Sapereira - Epicor2:00 PM - 2:30 PM - Automation Studio with Salesforce - Phil Leaman - Beck2:30 PM - 3:00 PM - Where I Work - OCM Team3:00 PM - 4:00 PM - Facility Tour - Sturdy non-open toe shoes required This meeting will be on Wednesday, April 17, 2024 from 8:30 AM to 4:00 PM at OCM Inc. located at 250 Hansen Access Road, King of Prussia, PA 19406 To register for this meeting, please go here. Registration deadline is 12:00 noon on this Friday (4/12). Hope to see you there,
Can I lock schedule of a Subassembly, so that even when “manually scheduling” that subassembly’s date do not get changed?We work with multi level subassembly jobs for our machines.We use backwards scheduling from the due date to generate required by date for each assembly and their materials.Occasionally we may want to schedule an assembly to start earlier than it needs to and to source the relevant materials earlier. Currently, the only way to do this is to unlink it from its relevant operation in the build sequence and try to link it to an earlier operation, but that does not really reflect its requirement in the build sequence.Via the Job Scheduling board, we see that that we can click and drag that operation alone to an earlier date and accept changes, which has the desired affect.We can also “Lock Schedule”, which stops the job from being automatically scheduled by processes.However, when the job is “manually scheduled”, that sub-assembly will be dragged back to its original requ
Hi there, Does anybody know how to rough cut schedule all unfirm job while finitely scheduling firm jobs? Thanks,Aaron
Would anyone know a way of exporting and importing Access Scope in Kinetic 11.2.300.9?The list - copy paste does not work. Thanks!
Is anyone using this feature? How is it working?
I figured out how to add the tab, but I am missing something as far as it is not showing as a tab across the top of a quote.This is what I see in PreviewThis is what I was expecting to see. Any ideas on what checkbox, setting, parameter I am missing in order to see this new tab on a quote?Thank youMelissa
Already have an account? Login
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.