We do a lot of buying to a job. These are mostly fabrics and lot controlled, so we cannot allow Epicor to automatically issue to the job at receipt. Currently the job material and the PO are not linked. It is only noted on the PO comments. That makes it very difficult to track. We move very fast and there is a lot of time pressure on each job. Is there a way to link the PO to the job but not automatically receive it to the job when the PO is received?
We are on 10.2.400